Desan launches Malaysia's first MPMS coast guard ship ahead of schedule
The 99 m multi-purpose mission ship for the Malaysian Maritime Enforcement Agency is due for delivery in January 2027.
Tuzla, İstanbul (and Gölcük, Kocaeli) · Repair, Conversion, Newbuilding, Naval
Kaptanoğlu Group yard founded in 1970, with three sites in Tuzla Bay and one in Gölcük on 148,000 m² in total. It runs four floating docks up to 234 × 51 m and 49,000 t for repair, conversion and newbuilding.
Not published by the yard: Max. capacity, Quay length
| L (m) | B (m) | Lift (t) | |
|---|---|---|---|
| Floating dock · Dock 1 | 234 | 51 | 49,000 |
| Floating dock · Dock 4 | 230 | 38 | 20,000 |
| Floating dock · Dock 2 | 177 | 32 | 19,000 |
| Floating dock · Dock 3 | 145 | 34.5 | 8,500 |
| Slipway · Wet slipway | 180 | 30 | – |
– = not published by the yard
| Vessel | Type | Owner / buyer | Stage | Source |
|---|---|---|---|---|
| MPMS-1 | Multi-purpose mission ship, 99 m | Malaysian Maritime Enforcement Agency | Launched · 2 Oct 2026 | Our story |
Only vessels with a published source; not a full list. The date is the date of the stage shown.
With your consent we use Google Analytics cookies to understand how the site is used. No advertising cookies. Cookie Policy