Tersan hands over first battery-electric autonomous ferry to Fjord1
The 120 m Skagastøl left Yalova for Norway, the first of four zero-emission ferries Tersan is building for Fjord1.
Altınova, Yalova (and Tuzla repair branch) · Newbuilding, Repair, Conversion


Shipbuilding and repair group with its main yard in Altınova, Yalova, and a repair branch in Tuzla, on about 320,000 m² in total. Its floating docks reach 310 × 51 m with 50,000 t lifting capacity.
Not published by the yard: Max. capacity, Quay length, Founded
| L (m) | B (m) | Lift (t) | |
|---|---|---|---|
| Floating dock · Dock 3 (Yalova) | 310 | 51 | 50,000 |
| Floating dock · Dock 2 (Yalova) | 180 | 29 | 9,000 |
| Floating dock · Dock 1 (Tuzla) | 130 | 22.5 | 6,500 |
| Slipway · Wide slipway (Yalova) | 200 | 56.5 | – |
– = not published by the yard
| Vessel | Type | Owner / buyer | Stage | Source |
|---|---|---|---|---|
| Acta Aquarius (NB1123) | DP2 walk-to-work CSOV | Acta Marine | Delivered · 14 Nov 2026 | Our story |
| Skagastøl (NB1130) | Battery-powered car and passenger ferry | Fjord1 | Delivered · 12 Nov 2026 | Our story |
| InterOcean (NB1139) | Cable-laying vessel | LS Marine Solutions | Keel laid · 2 Sept 2026 | Our story |
Only vessels with a published source; not a full list. The date is the date of the stage shown.
With your consent we use Google Analytics cookies to understand how the site is used. No advertising cookies. Cookie Policy