Latest news
Shipyards

Second Portuguese Navy support ship laid down at Ada Shipyard

STM and Ada Shipyard are building two 137 m replenishment and logistics ships for Portugal, with deliveries in 2028.

Keel laying ceremony for NRP Fernando Pessoa (A5212) at Ada Shipyard
Photo: Mavi Savunma

The second replenishment and logistics support ship for the Portuguese Navy has been laid down at Ada Shipyard in Istanbul, under STM as main contractor. The ship has been renamed N.R.P. Fernando Pessoa (A5212); it was previously planned as Dom Dinis. Both ships of the class are being built in parallel at the same yard.

The ships are 137 m long with a displacement of about 11,000 t and a top speed of over 18 knots. They can stay at sea for 30 days, carry up to 20 light armoured vehicles and accommodate a 100-person mission crew plus 100 others.

The contract was signed in Lisbon in December 2024. Launch is planned for 2027 and delivery for 2028. The project is described as Türkiye’s first naval ship export to an EU and NATO member.

Source: İstanbul Ticaret Gazetesi (AA)

Ada Shipyard: yard profile →

Related news

All news →